Showcasing our engineering achievements across Rwanda and beyond.
PROVIDING DETAIL DESIGN OF MPAZI ROAD (8 km) AND FOOTPATH (9.4 km)
FEASIBILITY STUDIES, PRELIMINARY AND DETAILED DESIGN OF THE ROAD
DETAILS DESIGN OF KIBEHO ROUND ABOUT.
Providing a detail design of Giswi - Rugogwe-Kabere - Nshiri tea factory -Ruheru Road( FR4: 21+600 KM) In Nyaruguru
AGATOBWE BRIDGE (60 M) STUDY AND DETAILS DESIGN
PROVIDING A DETAIL DESIGN OF RWABUYE – MBAZI ROAD (5km) and TUMBA (1Km)
Street light design
TOPOGRAPHIC SURVEY DETAIL FOR DESIGN REVIEW AND SUPERVISION OF NGORORERO WATER SUPLY SYSTEM (168.4 km).
TOPOGRAPHICAL SURVEYOR FOR FEASIBILITY STUDY, DETAILED DESIGNS AND SUPERVISION OF WORKS FOR THE CONSTRUCTION OF SAKE WATER SUPPLY SYSTEM – RWANDA, (487 KM)
CONSULTANCY SERVICE FOR DESIGN OF PARKING AT RWACOF DETAILED DESIGN REPORT
CONSULTANCY SERVICES FOR FEASIBILITY STUDYAND DETAILED DESIGN FOR MAINTENANCE OF THE MIGINA DYKE ROAD IN BUGESERA DISTRICT